Friday, 24 January 2014

Oop Twmbarlwm they are having a Tidy Tump Day

Dear all, our friends up on Twmbarlwm are having a Tidy Tump day on Sat 25th January and welcome all volunteers to come along and join in. Details for this event are below:
You can visit their new website here: www.twmbarlwm.co.uk

Monday, 20 January 2014

Erode is long!


One of the regular volunteers with Friends of Henllys LNR recently mentioned that one of the footpaths off the LNR was in a dreadful state due to prolonged torrential rainfall. Upon a closer inspection the stone footpath had been washed away in places 50cm wide and 35 cm deep.

55 cm wide and 30 cm deep
 
Water flowing along the footpath from 2 stream breaches
The cause of this appeared to be from 2 places where the stream, which is elevated to the footpath, broke its banks in 2 places. Some of this is due to silting up and blockages from fallen branches snagging and building up dams forcing the stream along different paths. We decided to take action on Friday, before it became even worse and just in case it gets repaired and the underlying cause was not investigated or treated.

Water pooling around LNR access gate
We decided that we could build a couple of fascines from brash collected on the Reserve from trees felled as part of the management plan with TCBC and volunteers. The woodsman’s grip mark II worked a treat...
Woodsman's grip II improved with a surplus electrical cable
...and the two bundles were tied up with wire and transported across the muddy reserve by wheelbarrow.
Could do with an ox
They were then put in place after several different orientations to best limit the flow onto the footpath.

Fascines in place note the water still running down the breach
We built on or fascine experiences on the Local Nature Reserve over the last 4 years and knew that these would silt up in time and would stabilise the banks, however, we needed to do a fix now, to stop further erosion. We decided to use some of the silt that had accumulated nearby to the fascines (probably adding to the problems) and backfilled behind and on top/through the fascine nearest to the bank. After a good load of this, the breach did appear to be blocked.
Backfilled with silt, breach appears repaired
A little further downstream and by standing in the stream, the second breach appeared to be caused by blockages in the normal route of the stream including branches and a carpet flytipped from the houses above in Llys Gwyrdd. These were unblocked by hand and 2 defences built up near the breach to try and halt the flow of water onto the footpath.
No more water flowing over breach 2
At the end of the footpath where the pooling was most prominent, we dug two drainage channels back towards the stream, but the flow away didn’t look fantastic considering the channel was over 30cm deep in places.
On the Saturday night, there was another yellow weather warning, more blocked drains and again more water cascading down the roads and into this stream. Sunday heralded a lovely day and we were fearful that these defences would not have held. However, it is nice to be surprised occasionally and the path near to the gate was immediately drier.
Much drier due to drainage channel
Moreover, the eroded channel was much drier with water in just the deepest sections.

(Sun) This was full of water on Friday and with heavy rainfall on Saturday evening drained away really well
Walking upstream, we were pleased to see that both the breaches had successfully held, which was brilliant news for us. A great result for a couple of volunteers.

Friday, 10 January 2014

Out with the Bouncy Bridge

Today I assisted TCBC Woodland Ranger, Jon Howells,  in making good a previous repair to the bridge over the stream near the Principal entrance of the Birch Grove Car Park. Originally the bridge wearing boards were made using mahogany, which is a very tough and stiff wood and now thankfully it use is much more controlled today as it grows in tropical rainforests. So when, the edges started to rot away, they were replaced with 1 inch thick decking boards. These are not quite the same as mahogany and when they were screwed down at the edges and middle, they were very springy....
starting to pull up the boards
so much so, that as people walked over them eventually, the screws were lifted out of the wood, increasing the "bounceupability" (Oxford English Dictionary take note of the word's first proper use) of the planks. So I'd be going backwards and forwards to the bridge putting in new screws. Anyway, the new Welsh Government Tidy Towns funded grant gave us a little bit of money to spend on the bridge to make it sound again.
This old one was thick and a bit rotten in parts so out it went
We then cut the new boards to length and laid them lengthwise and impact driver'd them down.
Over the boardwalk
These were the foundations for the old boards to go back on top in the same orientation as before, first we had to cut them down to fit the width of the bridge.
Cutting and laying the boards down
We put all the boards down, spaced them out and screwed them down again with the impact driver. While we were finishing off 3 LNR users came over the bridge and said how much better it was, so not a bad day's work all in all.
Bouncy bridge bye bye
Before I end this blog update, I'd like to shamelessly plug a colleague of mine Gareth Davies who works for Environment Wales, who recently completed a year doing loads of different activities raising money for Recovery Cymru and Keep Wales Tidy. My personal favourite was him giving up alcohol for a whole year in memory of his Mam. A brave, touching and fantastic achievement. If you have a second there is a 3 and a bit minute video showing some of the stuff he got up to which can be viewed here.
 
If anyone wanted to, Gareth's "Just Giving" link is here too.